- 1. About ZenTao Max
-
2. Installation
- 2.1 Choose the Proper Installation Method
- 2.2 Windows
- 2.3 Linux
- 2.4 Source Code
- 2.5 Example: Source Code Installation
- 3. Upgrade
-
4. New Concept
- 4.1 Program
- 4.2 Project
- 4.3 Product
- 4.4 Management Model
- 5 Navigation Bar Adjustment
- 6 Privilege Adjustment
-
7. Project
-
7.1. Project General Function
- 7.1.1 Basic Settings of Project
- 7.1.2 Execution
- 7.1.3 Software Requirement
- 7.1.4 Bug, Case, Request, and Report
- 7.1.5 Document
- 7.1.6 Build and Release
- 7.2. Waterfall Project Function
-
7.1. Project General Function
- 8 Asset Repository
- 9 Modify Record
Program
- 2021-05-13 09:19:48
- Taotao
- 2804
- Last edited by Hongyan on 2022-03-21 15:00:55
- Share links
A program is a collection of interrelated and coordinated projects. It is at the highest level and belongs to the concept of a strategic level.
It has multi-level project management, helping managers to form strategic directions and allocate resources at a macro level. At the same time, it supports hierarchical access control, and the project set and the sub-projects and projects below can be separated by privileges.
As shown in the figure, the program has the highest level, under which one or more sub-programs, products and projects can be managed. Products can only be linked to the top-level program.
Write a Comment
Products
- ZDOO
- ZDOO Cloud
Support
- Book a Demo
- Tech Forum
- GitHub
- SourceForge
About Us
- Company
- Privacy Policy
- Term of Use
- Blogs
- Partners
Contact Us
- Leave a Message
- Email Us: [email protected]