1. QuickStart
1.1. QuickStart of ZenTao 12 series
1.1.1 Document management
1.1.2 How to check whether a user has product and project access permission
1.1.3 Annual summany
1.2. ZenTao 12 series Starter
1.2.1 Manage personal issues in ZenTao
1.3. ZenTao 12 series Advanced
1.3.1. Process overview
1.3.1.1 ZenTao project management flow chart
1.3.2. Personal issues management
1.3.2.1 Manage personal issues in ToDo
1.3.2.2 Focus on the tasks, stories, and bugs assigned to me
1.3.2.3 Check or change my information in my profile
1.3.3. Product Manager management
1.3.3.1 Manage product
1.3.3.2 Manage product line
1.3.3.3 Create and review stories
1.3.3.4 Change story and review story
1.3.3.5 Story status and development stages
1.3.3.6 Notes of the Story
1.3.3.7 Manage product module
1.3.3.8 Create plans
1.3.3.9 Create releases
1.3.3.10 Roadmaps
1.3.3.11 Document management
1.3.3.12 Product planning meeting
1.3.3.13 Participate in project management, demostrations, and summaries
1.3.3.14 Basic statistical reports of stories
1.3.4. Project Manager management
1.3.4.1 Create a project
1.3.4.2 Set up the project team
1.3.4.3 Determaine the story list in a project
1.3.4.4 Task Breakdown
1.3.4.5 Daily standup meetings
1.3.4.6 Track the progress of projects via Burndown chart
1.3.4.7 Track the progress of projects via various lists
1.3.4.8 The review meeting and retrospective meeting
1.3.4.9 Basic statistical reports for project tasks
1.3.5. Development Team management
1.3.5.1 Participate in project planning meeting and decompose tasks
1.3.5.2 Create build
1.4. QuickStart of ZenTao Biz 12 series
1.4.1 Gantt Chart

Story status and development stages

2022-12-14 16:44:39
Kelsea
552
Last edited by Yujia Li on 2023-01-03 16:19:11
Share links
Summary : This article is about the change in the Story Status and the Development Stage of Stories in ZenTao.

There are two fields in ZenTao to track the changes of stories. One is Story Status and the other one is the Development Stage of Stories. Now, let’s take a look at the two fields in details.


1. Story Status

There are four types of story status, Draft, Active, Changed and Closed. The corresponding actions are Create, Change, and Review, Close and Activate. The status flow is shown below.

 

2. Development stage of stories

A stage is to describe the phase of an active story in development. The stages include Wait, Planned, Projected, Developing, Developed, Testing, Tested, Accepted and Released.

img

 

How to change the development stages of stories?

One way is to change the development stage through editing. However, we prefer another option, which is to carefully set the type of task, such as development, testing, when creating tasks. And ZenTao will automatically calculate the development status of a story based on the changes of different types of tasks. The rules are,

  1. If stories are not linked to any projects or plans, the phase will be Wait.
  2. If stories are linked to plans but not to projects, it will be Planned.
  3. If stories are linked to projects but not decomposed to tasks, it will be Projected.
  4. If stories are linked to projects and decomposed:
  • If one of the development tasks is being done while all the test requests have not yet begun, it will be Developing.
  • If all the development tasks are completed while all the test requests have not yet been begun, it will be Developed.
  • If one of the test requests has been begun, it will be Testing.
  • If all the test requests are completed while some development tasks have not been completed, it will also be Testing.
  • If both the test requests and development tasks are completed, it will be Tested.
 5. The phase of Acceptance should be confirmed manually by the project manager/scrum master.

 6. If the stories are linked in Product > Release, it will be Released.

 

Description of the stage of stories which belong to a multi-branch or multi-platform type product:

Take a multi-platform product as an example. A product has Andriod and IOS platforms.

  • If the story is not linked to any project/plan, the story status is Wait.
  • If the story is linked to all platforms and its linked plans are linked to all platforms, the story status is "All Platforms: Planned". If the plan is linked to IOS, the story status is "IOS: Planned". If the story is linked to a specific platform, its status will be decided in the way mentioned above ( How does a story change in development? ).
  • The project is linked to a platform of the product. For example, the project is linked to IOS, and it is linked to the stories of all the platforms of the product it is linked to and the stories linked to IOS. The stories haven't been decomposed into tasks. Then, the status of a story that is linked to IOS is "Planned" and the story status of all the platforms that the product is linked to is "IOS: Planned". If the story status of all the platform that this story is linked to is "Planned", it will show "All Platforms: Planned" and "IOS: Projected".

If a story is linked to two projects, one of which is linked to IOS and the other to all platforms of the product. Task breakdown is done yet. Then the status of this story is "All Platforms: Projected" and "IOS: Projected".

 

Notes: From Zendo 7.2.stable version, you can manually change the stage of the requirement. (If the requirement belongs to all branches/all platforms, the system will calculate the stage under all branches/platforms, so it cannot be edited or modified separately.)

 

Tips:

Phase=Stage (Stage is a field in the database and Phase is a field in the ZenTao page.)

Write a Comment
Comment will be posted after it is reviewed.